Answer:
x=6/5
Step-by-step explanation:
Answer:
420 cm, 4.3 meters, 4600 mm, 0.04 km
Step-by-step explanation:
We can solve this by converting each to the same unit. I will be using meters.
0.04 km
1 km = 1000 meters
1000 meters / 1 km = 1
multiply 0.04 km by 1 = 1000 meters / 1 km , keeping the km at the bottom to cross out
0.04 km * 1000 meters / 1 km = 40 meters
420 cm
100 cm = 1 meter
1 meter / 100 cm = 1
multiply 420 cm by this, keeping cm at the bottom so it crosses out
420 cm * 1 meter / 100 cm = 4.2 meters
4600 mm
1000 mm = 1 meter
1 meter / 1000 mm = 1
4600 mm * 1 meter / 1000 mm = 4.6 meters
Therefore, our order is
420 cm, 4.3 meters, 4600 mm, 0.04 km
Answer:
2,000
4,000
7,000
put points on (2, 2,000) - (4, 4,000) - and (7, 7,000)
Step-by-step explanation:
Answer:
The 80% confidence interval for the population proportion of oil tankers that have spills each month is (0.199, 0.257).
Step-by-step explanation:
In a sample with a number n of people surveyed with a probability of a success of
, and a confidence level of
, we have the following confidence interval of proportions.

In which
z is the zscore that has a pvalue of
.
Suppose a sample of 333 tankers is drawn. Of these ships, 257 did not have spills.
333 - 257 = 76 have spills.
This means that
80% confidence level
So
, z is the value of Z that has a pvalue of
, so
.
The lower limit of this interval is:

The upper limit of this interval is:

The 80% confidence interval for the population proportion of oil tankers that have spills each month is (0.199, 0.257).