I am inclined to think that it is A. or B. Because they represent the highest probability, if it is not those it might be D.
This probably didn’t help, but if it did. I am glad (╹◡╹)
Answer:
D is the answer
Step-by-step explanation:
Well 35 dollar one time fee
plus 15 per hour
If used 1 hour 15+35=50
Answer:
scale factor of 4
Step-by-step explanation:
3 times 4 equals 12
-4 times 4 equals -16
Your answer would be 14 meters
Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42