1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
alexdok [17]
2 years ago
6

Solve the equation and check the solution.

Mathematics
2 answers:
alexdok [17]2 years ago
7 0

Step-by-step explanation:

A - 2.5 = 1.5

A = 1.5 + 2.5 (Add 2.5 on both sides)

A = 4.

Nookie1986 [14]2 years ago
5 0

Answer:

C

Step-by-step explanation:

You might be interested in
Determining probability of events. please help! ​
Aneli [31]
I am inclined to think that it is A. or B. Because they represent the highest probability, if it is not those it might be D.

This probably didn’t help, but if it did. I am glad (╹◡╹)
6 0
3 years ago
SIMPLE SEVENTH GRADE MATH PROBLEM. GOVING BRAINLIEST
adelina 88 [10]

Answer:

D is the answer

Step-by-step explanation:

Well 35 dollar one time fee

plus 15 per hour

If used 1 hour 15+35=50

5 0
3 years ago
Read 2 more answers
If a point on the pre-image has coordinates (3.-4), and the coordinates of Its Image are (12,-16), what scale factor was
Ksenya-84 [330]

Answer:

scale factor of 4

Step-by-step explanation:

3 times 4 equals 12

-4 times 4 equals -16

3 0
3 years ago
A flagpole 1400 cm tall is how many meters tall?
iogann1982 [59]
Your answer would be 14 meters
4 0
3 years ago
Ship Co. produces storage crates that require 1.2 meters of material at $.85 per meter and 01 direct labor hours at $15.00 per h
Vesna [10]

Answer:

$3.42

Step-by-step explanation:

Meters of material required = 1.2 meters

Cost per meter of material = $0.85

Direct labor hours = 0.1

Cost of direct labor per hour = $15

Overhead rate = $9 per direct labor hour

Standard cost per unit of product :

(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)

Direct material cost per unit :

Material needed × cost per meter = (1.2 × $0.85) = $1.02

Direct labor cost per unit :

Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5

Overhead cost:

0.1 * $9 = $0.9

Standard cost :

($1.02 + $1.5 + $0.9) = $3.42

5 0
3 years ago
Other questions:
  • 22 is 33 1/3% of what number
    7·2 answers
  • Which postulate can be used to prove that the two triangles below are Congruent?
    13·2 answers
  • Find the value of two numbers if their sum is 78 and their difference is 22.
    12·1 answer
  • Which graph represents the piecewise-defined function?
    7·2 answers
  • PLEASE HELP!! BRAINLIEST OFFERED!!!
    9·2 answers
  • Draw a number line and show all numbers that are 2/3 of a unit to the left of 1/2
    15·1 answer
  • Suppose V is finite-dimensional and v1; : : : ; vm 2 V. Define a linear map W V 0 ! Fm by .'/ D '.v1/; : : : ; '.vm/ :
    6·1 answer
  • Please help ASAP <br> Questions 1 and 2 plzzzzz
    13·1 answer
  • 9 9/15 - 2 13/15 = <br> i have know idea what it is plz help
    7·1 answer
  • Find the coordinate of the points of intersection of the graphs without building them: 20x - 15y = 100 and 3x - 5 =6y
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!