Answer:
$ 2250
Step-by-step explanation:
3375 = s³
s = ∛3375
s = 15 ft.
floor area = s² = (15 * 15)
floor area = 225 ft²
the contractor charges $10 per ft².
therefore,
the hardwood cost = 225 x $10 = $2250
Answer:
I think the answer is Four
Step-by-step explanation:
3.9-8= 4,5,6,7
Answer:
Hello! x = 6
angle measure: 64
HOPE THAT HELPS a bit when trying to solve the whole thing
Answer:
AD = 1/4AC
Step-by-step explanation:
Given that,
D is the the midpoint of AB
Therefore
AB = AD + DB
Since, D is the midpoint of the AB, therefore AD = DB
AB = AD + AD
AB = 2AD (i)
Similarly, B is the midpoint of AC
Hence,
AC = AB + BC
AC = AB + AB (because B is the midpoint)
AC = 2AB (ii)
By putting the value of AB from equation i to equation ii, we get
AC = 2(2AD)
AC = 4AD
AC/4 = AD
AD = 1/4AC