Answer:
Median = 13&14
&
1st Quartile=24
Step-by-step explanation:
Think it Helped U
Answer:
The answer in interval notation is ( 73 , 100 )
Step-by-step explanation:
If we call x and y the lower and upper values for David to get an average of 80 and 89 respectively, we can calculate these two values solving a pair of equations:
(81 + 92 + 74 + x ) / 4 = 80 ⇒ (247 + x )/4 = 80
247 + x = 320 ⇒ x = 320 - 247
x = 73
And
(81 + 92 + 74 + y ) / 4 = 89 ⇒ ( 247 + y ) / 4 = 89
247 + y = 356
y = 356 - 247
y = 109
But tests are a 100-point test
Then the answer in interval notation is ( 73 , 100 )
Answer:
The question is not complete, nut here is the complete question ; A company produces alarm clocks. During the regular workweek, the labor cost for producing one clock is $4.00. However, if a clock is produced on overtime, the labor cost is $5.00. Management has decided to spend no more than a total of $51,000 per week for labor. The company must produce 12,000 clocks this week. What is the minimum number of clocks that must be produced during the regular workweek?
Step-by-step explanation:
Tthe detailed analysis and step by step calculation is as shown in the attached file.
What do u bealive or think g is
Answer:
P=20%
Step-by-step explanation:
Let's suppose that each question in the test has one and only one correct answer. This means we have 1 desired outcome out of the total 5 desired outcomes. Therefore:
Probability=#of desired outcomes / #of possible outcomes
or


P=0.20
P=20%