We cannot calculate the confidence interval without the sample size. However, for the second question, the sample size needed would be 49.
The formula we use is

To find the z-score:
Convert 98% to a decimal: 0.98
Subtract from 1: 1-0.98 = 0.02
Divide by 2: 0.02/2 = 0.01
Subtract from 1: 1-0.01 = 0.99
Using a z-table (http://www.z-table.com) we see that this value is closest to a z-score of 2.33.
Using the z-score, our standard deviation (9) and our margin of error (3), we have:
Answer:
8p +56 +16q
Step-by-step explanation:
8 (p+7+2q)
If we distribute the 8 into everything in the parenthesis, we get:
8p +56 +16q
The 60 represents the rate at which the train is traveling in km per hour. So, I believe the answer would be D (sorry if this is wrong, to be honest I’m just using context clues)
The slope of these lines is -17/7