Answer:
I am not so clear about this question
 
        
             
        
        
        
Answer:
A. y = 80x
B. g(x) = 80x
C. To graph the equation, plot a point at (0,0) and a point at (1,80). Connect the points. Continue adding points by moving up $80 and over 1 day.
Step-by-step explanation:
Part A:  
To write an equation, use y= mx where m is the slope, x is the number of days, and y is the rent cost.
x and y remain the same in the equation.
To find m, use the slope formula with (5,465) and (7, 625).

It costs $80 a day.
The equation is y = 80x.
Part B:  
Function notation replaces Y as g(x). So the equation is g(x) = 80x.
Part C:
To graph the equation, plot a point at (0,0) and a point at (1,80). Connect the points. Continue adding points by moving up $80 and over 1 day.
 
        
             
        
        
        
It' only 8 poins btw And there is not enough information but I try my best y = a times t                              y = 200 + 250 divided by 325 I believe these are the answers
        
                    
             
        
        
        
X > -2....................
        
             
        
        
        
Answer:
3x the second one 
Step-by-step explanation: