Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
I think that the number of times you drink all the water in your bottle is independent, because the number of liters you drink depends on how much there is.
Independent- the number of times you drink all the water in your bottle
Dependent- the number of liters you drink
X²-9x=36
minus 36 both sides
x²-9x-36=0
what 2 numbers multiply to -36 and add to -9
-12 and 3
(x-12)(x+3)=0
set to zero
x-12=0
x=12
x+3=0
x=-3
the number is either -3 or 12
Answer:
4/10, 6/15, 8/20, and 10/25
Step-by-step explanation:
Hope this helps. :)