This is an easy one.
65/5= 13.
Therefore, she descended 13 feet per minute.
Answer:
Weight of copper: 62,000 lbs. (31 tons). Weight of framework: 250,000 lbs. (125 tons). Weight of concrete foundation: 54,000,000 lbs. Thickness of copper sheeting: 3/32 of an inch, the thickness of two pennies placed together. the answer in 125
Step-by-step explanation:
I don’t know if that’s what you wanted but I hope I helped ;D (sorry for my bad english)
Answer:
P = (2, 7)
Step-by-step explanation:
You want to find coordinates of P on segment AB such that P is 3/4 is of the way from A to B.
<h3>Equation for P</h3>
For some fraction q of the distance from A to B, the point P that lies at that fraction of the distance is given by ...
P = A +q(B -A) = (1 -q)A +qB
<h3>Application</h3>
For q = 3/4, the location of P is ...
P = (1 -3/4)A + 3/4B = (A +3B)/4
Using the given point coordinates, we have ...
P = ((-4, -2) +3(4, 10))/4 = (-4 +12, -2 +30)/4 = (8, 28)/4
P = (2, 7)
Step-by-step explanation:
