Answer:
11,059
Step-by-step explanation:
If you take the combined elevation (18,152) and subtract the elevation of Snowy Mountain (7,093), you should get 11,059.
-24a²- 6a +9 = - 3(8a² +6a - 9)
8a² +6a - 9 =0
x=(-b +/-√(b² - 4ac))/2a
x = (-6 +/-√(36+4*8*9) /(2*8) = (-6 +/-√(324) /16 = (-6 +/-18)/16
x1 = (-6 +18)/16 = 0.75
x2 = (-6 -18)/16 = - 1.5
-24a²- 6a +9 = - 3(8a² +6a - 9) = -3(a - 0.75)(a + 1.5)
Answer:
Step-by-step explanation:
Here are the 3 answers you needed :)!!!
To fill:
6 hours = 1 tank
1 hour = 1/6 tank
To drain:
It takes 4 times as long, therefore 4 x 6 = 24
24 hours = 1 tank
1hour = 1/24 tank
If both pipes are open
1 hour = 1/6 - 1/24 = 1/8 tank
1/8 tank = 1 hour
8/8 tank = 1 x 8 hour
1full tank = 8 hours
Try this option.
1 is for scalar (result is number), 2 is for vector (result is vector).