Answer:
Don't accept A-G
Accept only A-E
Step-by-step explanation:
The company would those projects with a return of return equal to or higher than its cost of capital of 10.45%
Project A with a 12% return is acceptable.
Project B with a 11.5% rate of return is also acceptable
Project C has a rate of return of 11.2% , hence acceptable.
Project D has 11% rate of return and it is therefore acceptable.
Project E has 10.7% return rate and it is acceptable.
Project F has a lower rate of return of 10.3%, hence rejected, as well as projects G
It should be 95,040. On the first day, you have 12 choices. On the second, eleven, and so on, until day 5. 12x11x10x9x8.
A) the only mistake is changing the mixed number to an improper fraction .
I’m pretty sure you just do 11-4 and get 7 and then do like 99 divided by 7?