Answer:
Sharika needs 2.5 days to finish the remaining work
Step-by-step explanation:
Sharika can do a work in 6 days palkey can do it in 8 days
Then the amount of work sharika can do in 1 day = 1/6
And the amount of work palkey can do in 1 day = 1/8
The amount of work both of them can do together in 1 day = 1/6 + 1/8
= 7/24
The amount of work both of them can do together in 2 day = (2× 7/24)
= 7/12
Since Palkey left the work,the amount of
work remaining for Sharika to do alone = (1 - 7/12 )
= 5/12
The number of days Sharika take to finish the remainig work. = (5/12 ÷ 1/6 )
= 5/2 days
Therefore, Sharika needs 2.5 days to finish the remaining work.
No, because if they were equal the second equation should be 225/(15x3), not (15/3).
= 0.10606
Step-by-step explanation:
Since we have only one digit in the numerator and the denominator has 2 digits, we have to 0 along with 7, so that it becomes 70, 1 time 66 is 66, 70 - 66 = 4 is the remainder, so the quotient is 0.1, then along with 4 we have to add one 0 , so it becomes 40 which is lesser than 66 so one more 0 is added and then it becomes 400, 6 times 66 is 396, 400 - 396 = 4 again the process going on. The quotient is 0.10606...
Answer:
0.25
Step-by-step explanation:
1. Add up all of the students.
20+20+25+7+13+5+3+2+5=100
2. Make a ratio of that number and the number of all the students in Music/Drama
MUSIC/DRAMA: 7+13+5=25

3. Simplify
= 0.25
Answer:
C
Step-by-step explanation:
Use πr²