Answer:
288
Step-by-step explanation:
24 = 8 1/3 % of x
24 = (25/3 * 1/100)x
25/300 x = 24
x = 24 * 300/25
x = 7200/25
x = 288
Answer:
9.50/ per hour
Step-by-step explanation:
adding the 8.5 x 3 (M/W/F)
plus the 6 x 2 (T/TH)
= 37.5 hours
356.75 divided by 37.5 = 9.5
Hope this helps
Answer: 2.6
Step-by-step explanation:
Step 1: Calculate the mean of Shade's plant heights.
= 7+12+12+8+9+8+8+8/8
= 72/8
=9
Step 2: Calculate the range of Shade's plant heights. Range is highest minus lowest number. This will be:
12 - 7 = 5
Step 3: Calculate the mean of Sun plant heights.
19+24+20+23+24+23+23+20/8
= 176/8
= 22
Step 4: Find the range of Sun plants height.
= 24 - 19 = 5
Step 5: Find the difference of means
= 22 - 9
= 13
Step 6: Divide the difference of means by the range.
= 13 ÷ 5
= 2.6