*ip+1
ip is a pointer to int
*ip is that int so *ip+1 is the value at ip plus 1
Answer:
Maintenance Phase
Explanation:
One of the concepts employed in project management for describing stages involved when carrying out an information system development project is the systems development life cycle (SLDC). The cycle which starts from carrying out a feasibility study and ends in maintenance is a highly used conceptual model. There are 5 major stages or phase and they are the; Requirement Phase, Design Phase; Implementation Phase, Test Phase, and the Maintenance phase. The maintenance phase comes when testing has been complete and all enhancement and modifications have already been developed, and the system is operating.
Avoid wikipedia, anyone can put answers down on there and make it seem correct but it is not. Do not trust any website research the websites or look at ratings if possible. Use the answers that google provides itself if possible. And research trusted websites.
If this helped please mark me as brainlest.
Answer:
- Transform binary or unary M:N relationship or associative entity with its own key.
Explanation:
Transform binary relation is described as the method through which a decimal can easily be converted into binary while the unary relationship is described as a relationship in which both the two participants occurs from the same entity.
In the given case, 'transform binary or unary M:N relationship' can be created using 'the primary key linked with the relationship plus any non-key aspects of the relationship and the primary keys of the related entities' as it displays the existence of a relationship between the occurrences of a similar set of the entity i.e. associative entity here.
Answer: Determine the most popular solution.
Explanation:
Some of the approaches to problem solving that are listed here include:
• Gather data and verify the most likely causes.
• Revise the project plan.
• Evaluate the alternative solutions
To solve a problem, one needs to gather the data and verify the likely causes of the problem. This can be done by asking questions, running test, interviewing people, running tests, reading reports, or analyzing data.
The project plan can also be revised. Likewise, when one comes with different solutions, one should weigh the cost and benefits of each in order to choose the best solution.
Determine the most popular solution isn't a correct option.