Answer:
The student is expected to spend <em>15.4 hours </em>doing homework
Step-by-step explanation:
The scattered plot shows there is a close correlation between the variables. A line of best fit will go through the 'center' of the points. Since we are not required to find an exact line, we'll draw it in red color as shown below
To know the equation of that line, we must take two clear points of it from the graph. We'll pick (28,4) and (4,25)
The equation of a line, given two points (a,b) and (c,d) is

Using the selected points

Simplifying and computing results, the equation is

Using that equation, we can predict how many hours the students will spend doing homework if they spend 15 hours watching TV
=15.4 hours
So the student is expected to spend 15.4 hours doing homework
Area is just height times width so if it’s a square all sides are equal so you do 3 2/7 time 3 2/7 and get 10.796 in^2
Answer: 4(5j+7) = 20j+28
Step-by-step explanation:
Answer:
AB=29; BC=27
Step-by-step explanation:
So they told us AB=4x+9 and that BC=5x+2, and AC=56 , now to help with the question you can draw this information on a number line. Now on a number you can see that basically AC=AB+BC.
So you would write it as such,,
4x+9+5x+2=56
Combine like terms
9x+11=56
Now you have to isolate the x by itself but first get rid of the 11.
9x+11-11=56-11
You would get
9x=45
Here you can divide 9 by both sides to isolate x.
9x/9=45/9
{x=5}
Now to find the value for both substitue x in the equations for both
1. AB=4x+9 where x is 5
4(5)+9 =AB
20+9 =AB
29=AB
You would do the same with BC
2. BC= 5x+2 where x is 5
5(5)+2= BC
25+2= BC
27=BC
If you want to check your answers you can just substitute x for 5 in the first equation we did where AC=AB+BC