916.60 will go to interest the first month.
The monthly interest rate is found by calculating
(5.5/100)/12 = 0.004583
Multiplying this by the amount of principal, we have
200000*0.004583 = 916.60
Answer:
I'm sorry but the document says "doesn't exist".
Step-by-step explanation:
I hope this helps! Have a great rest of your day!
Answer: y=2.28x ; 20.52 feet in 9 minutes.
Step-by-step explanation:
X represents the minutes the snail travels, 2.28 represents traveling that many feet for every minute. Plug in the 9 (minutes) for x and multiply to get 20.52 feet.
Weight, weight relies on gravity so if a planets gravity is different than ours on earth, an objects weight will change on such planet
Answer:
a. Average cost equation

b. Q = 112 units
c. Average cost (Q = 112 units) = GHS 5.12
d. Usually, the actual production capacity.
Step-by-step explanation:
We will use $ as the currency symbol for GHS.
a) We have:
- Variable costs: 0.65Q
- Fixed costs: 250
- Special costs: 0.02Q^2
Then we can write the total cost equation as:

The average cost function can be calculated dividing the total cost equation by Q. Then, we have:

b) The output level that minimize the average cost can be calculated deriving the average cost equation and making it equal to zero:

The output level that minimizes cost is Q=112 units.
c. The average cost of production for the output level of 112 is:

d. The limitation is not specified, by this models have a range of Q values where it is valid. These range is usually dependent on the scale of the production. The factory will have a maximum level of production, and over this level, the cost equation is different as other investments are needed.