Step-by-step explanation:
To find the mean absolute deviation of the data, start by finding the mean of the data set.
Find the sum of the data values, and divide the sum by the number of data values.
Find the absolute value of the difference between each data value and the mean: |data value – mean|.
Find the sum of the absolute values of the differences.
Divide the sum of the absolute values of the differences by the number of data values.
Answer:
40 days
Step-by-step explanation:
Let x represent the original production time. Then 70x is the order quantity involved.
When the same order quantity is produced at a rate of 80 items per day for x-5 days, we have the equation ...
70x = 80(x -5)
70x = 80x -400
0 = 10x -400 . . . . . subtract 70x
0 = x -40 . . . . . . . . divide by 10
40 = x . . . . . . . . . . add 40
The original schedule was for production to take 40 days.
Answer:
2
Step-by-step explanation:
Assume that
a and b = the two legs of the right triangle.
c = the hypotenuse.
The area of the right triangle is 750 yd², therefore
(1/2)*a*b = 750
ab = 1500 (1)
The perimeter is 150yd, therefore
a + b + c = 150 (2)
Let the side fenced with wood be a, at $5/yd. Sides b and c are fenced with steel at $10/y. The total cost is $1200, therefore
5a + 10b + 10c = 1200
or
a + 2b + 2c = 240 (3)
From (2), obtain
c = 150 - a - b (4)
Substitute (4) into (3)
a + 2b + 2(150 - a - b) = 240
-a + 300 = 240
a = 60
From (1), obtain
60b = 1500
b = 25
From (4), obtain
c = 150 - 60 - 25 = 65
Answer:
A. The length of the leg fenced with wood is 60 yd.
B. The length of the leg fenced with steel is 25 yd.
Answer:
C?
Step-by-step explanation: