Answer:
10 pounds of trial mix that costs $2.45 and 20 pounds of trial mix that costs $2.30
Step-by-step explanation:
Answer:
A
Step-by-step explanation:
Answer:
1. Tell her you were down with a temperature or simply that you felt dizzy.
2. You were out to some function.
The answer is B. The data is similar throughout the line.
Based on the given parameters of a = 1.7 cubic feet and concrete for first 4 steps as 17 cubic feet, the concrete is required for the first 12 steps is 132.6 cubic feet
<h3>Arithmetic progression</h3>
- First term, a = 1.7 cubic feet
- Sum of first four terms = 17 cubic feet
Sn = n/2 {2a + (n - 1) d}
17 = 4/2{2×1.7 + (4 - 1)d}
17 = 2{3.4 + (3)d}
17 = 2(3.4 + 3d)
17 = 6.8 + 6d
17 - 6.8 = 6d
10.2 = 6d
d = 10.2/6
- Common difference, d = 1.7
Concrete required for first 12 steps;
Sn = n/2 {2a + (n - 1) d}
= 12/2{2×1.7 + (12-1)1.7}
= 6{3.4 + (11) 1.7}
= 6(3.4 + 18.7)
= 6(22.1)
= 132.6
Concrete required for first 12 steps = 132.6 cubic feet
Learn more about sum of arithmetic progression:
brainly.com/question/24205483
#SPJ1