In other words, what is <em>y</em> if <em>x</em> is 0.
Look on the graph, a line passes through point, 
So we can conclude that at that very point the input <em>x</em> was 0 and the output <em>y</em> was -3 therefore,

Hope this helps.
<u>r3t40</u>
The answer is b its easy i had this one
Answer:
Resultant vector of two vectors is (0, 0).
Step-by-step explanation:
in this question two vectors having ordered pair (-6, 5) and (6, -5) have been given.
We can represent these vectors in the form of

and 
Now the resultant of these vectors will be = A + A'
A + A' =
+ 
So the resultant vector = (0 + 0)
Therefore the resultant will be (0, 0)
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.
He would be 25 inches tall.
40 divided by 8 would equal 5 so at age 1, he was 5 inches tall. So 5 times 5 which is how old he was, would equal 25 inches.