First set up a linear equation and using the x and y values in the table see if it solves.
It doesn't solve so we know it isn't linear. ( I won't show all those steps because they aren't needed.)
Using the quadratic formula y = ax^2 +bx +c
Build a set of 3 equations from the table:
C is the Y intercept ( when X is 0), this is shown in the table as 6
Now we have y = ax^2 + bx + 6
-2.4 =4a-2b +6
1.4 = a-b +6
Rewrite the equations
a=b/2 -2.1
1.4 = b/2-2.1 +6
b = 5
a = 5/2 -2.1 = 0.4
replace the letters to get y = 0.4x^2 + 5x +6
Answer:
Rate is 9 kilometers (km)/week.
Step-by-step explanation:
9000 meters is 9 km (divide m by 1000 to get km)
First you raise the expressions in the parentheses to their powers. Then multiply the two expressions together. You get to see multiplying exponents (raising a power to a power) and adding exponents (multiplying same bases).
4 is 16.3, I don't know 5 or 6, 7 is 176, I don't know 8 or 9, 10 is 8.1, I don't know 11, and 12 is 48.
(I used a calculator, lol)