<h3><em><u>A. 4xy-16</u></em></h3>
<em><u>=4(xy−4)</u></em>
<h3 /><h3><em><u>B. xy+2xy-x</u></em></h3>
<em><u>3xy−x</u></em>
<em><u>=x(3y−1)</u></em>
<h3><em><u>C. 2x²-18x+12</u></em></h3>
<em><u>2x²</u></em><em><u>−18x+12</u></em>
<em><u>=2(</u></em><em><u>x²</u></em><em><u>−9x+6)</u></em>
<h3><em><u>D. 5xy+20x-9y-36</u></em></h3>
<em><u>5xy+20x−9y−36</u></em>
<em><u>=(y+4)(5x−9)</u></em>
Step-by-step explanation:
In ordee to round the number 7209 to the nearest thousands, we take a look at the digit in the hundreds place (which is 2).
Since 2 < 5, we round the number itself down to the nearest thousands:
7209 => 7000.
Hence our rounded number is 7000.
Answer:
Correct answer = 20 miles
Step-by-step explanation:
The mistake she made was that she made was that she multiplied the amount with 3 instead of dividing it.
The incorrect way -
$60 = 3 × 60 = 90 (Her multiplication is also incorrect as 3 × 60 = 180)
Corrected method -
$60 =
= 20 miles
<h3>Hope you understood. Please mark my answer as the brainliest.</h3>
Answer:
T = 3.5 hours
Step-by-step explanation:
this is a rate problem.
an experienced surveyor takes 7 hours to survey a roadbed
an apprentice surveyor takes 9 hours to survey a roadbed
the rate of the experienced surveyor =
the rate of the apprentice surveyor = 
if the two work together , 
T = 
T = 3.5 hours