Answer:
The answer is 31%
Explanation:
Hope you have a great day
Answer:
it makes the price so low that the quantity demanded exceeds the quantity supplied on the legal market.
Answer: a) the type of exposure to Geomyces destructans; whether the bats became sick with WNS
Explanation: The independent variable refers to the variables employed by the experimenter to use as a tool to observe changes in the dependent variable. In an experimental study, the independent variables are usually the different controls adopted for the experiment. In the scenario above, the independent variable is the type of exposure to Geomyces destructans which each of the groups are exposed to. These variation in control in which the different groups are exposed to may result in different response within the group which is the change in WNS. These response due to exposure to different control is called the dependent variable.
<span>Credit card has slightly lower interest rate.
Let's take a look at both interest rates for 1 year and see what costs more. First, the credit card at 17% apr compounded monthly.
Each month, 17%/12 interest will be taken. The total interest over the year will be
(1 + 0.17/12)^12 = 1.183891728 times the original debt.
Now let's look at the loan from the parents. Over 1 year, you'll be accumulating 2 interest payments. The formula for the year will be
(1 + 0.09)^2 = 1.1881
Comparing the overall rate between the credit card and the parents, the credit card is slightly lower than the parents.</span>
Correct/Complete Question:
What is the time of the slowest workstation in a production system?
A. utilization
B. bottleneck time
C. effective capacity
D. throughput time
Answer:
B, bottleneck time
Explanation:
A bottleneck in a production system refers to a constraint in the production system where supply takes the longest time to meet up with demand for a particular good.
In the production processes, bottleneck time is the time takencapacity of the ful in a certain process of production as a result of the limited capacity of the process, thereby reducing the entire production chain.
Simply put, a bottleneck is a delay in time of one of the production process thereby slowing down the entire production system.
Cheers.