1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Hunter-Best [27]
3 years ago
11

I dont Know what to put here But Anwer Pls

Mathematics
1 answer:
g100num [7]3 years ago
5 0

Answer:

12

Step-by-step explanation:

So, the 24cm, is the diameter, a little circle autonomy here, the diameter is the length across the circle, and the radius is to the mid point, or half-way point, which means that the radius is half the diameter, so, 24 ÷ 2 = 12

hope this helps:)

You might be interested in
please help as soon as you see this because people keep answering my questions a day later it’s too late by then‍♂️ & if you
melisa1 [442]

Answer:

A. Cylinder, Shpere, Cone

Step-by-step explanation:

a cylander can be made by rotating a square.

for a sphere, a semi-circle.

for a cone, a right triangle.

hope this helped you

7 0
3 years ago
How much is 2/7 of 1 and 3/4
rodikova [14]
The answer is 0.5 cool
8 0
3 years ago
Read 2 more answers
Suppose that your business is operating at the 4.5-Sigma quality level. If projects have an average improvement rate of 50% annu
Luda [366]

Answer:

  11.75 years

Step-by-step explanation:

If we ignore the fact that "6-sigma" quality means the error rate corresponds to about -4.5σ (3.4 ppm) and simply go with ...

  P(z ≤ -6) ≈ 9.86588×10^-10

and

  P(z ≤ -4.5) ≈ 3.39767×10^-6

the ratio of these error rates is about 0.000290372. We're multiplying the error rate by 0.5 each year, so we want to find the power of 0.50 that gives this value:

  0.50^t = 0.000290372

  t·log(0.50) = log(0.00290372) . . . . take logarithms

  t = log(0.000290372)/log(0.50) ≈ -3.537045/-0.301030

  t ≈ 11.75

It will take about 11.75 years to achieve Six Sigma quality (0.99 ppb error rate).

_____

<em>Comment on Six Sigma</em>

A 3.4 ppm error rate is customarily associated with "Six Sigma" quality. It assumes that the process may have an offset from the mean of up to 1.5 sigma, so the "six sigma" error rate is P(z ≤ (1.5 -6)) = P(z ≤ -4.5) ≈ 3.4·10^-6.

Using that same criteria for the "4.5-Sigma" quality level, we find that error rate to be P(z ≤ (1.5 -4.5)) = P(z ≤ -3) ≈ 1.35·10^-3.

Then the improvement ratio needs to be only 0.00251699, and it will take only about ...

  t ≈ log(0.00251699)/log(0.5) ≈ 8.6 . . . . years

5 0
3 years ago
if each interior angle of a regular polygon measures 144 degrees, how many sides does the polygon have?
Lubov Fominskaja [6]
10 sides 180(10-2) 1800-360=1440/10 = 144
3 0
3 years ago
Factorise k(a³ + b³)-m(a³ + b³)​
Neporo4naja [7]

Answer:

this is so easy

Step-by-step explanation:

8 0
3 years ago
Other questions:
  • Ethan is using his compass and straightedge to complete a construction of a polygon inscribed in a circle. What polygon is he in
    8·1 answer
  • Solve for d. 12−34(d+16)=−5
    5·2 answers
  • The perimeter of a rectangular field is 358 yards. If the length of the field is 95 yards, what is it’s width?
    7·2 answers
  • How to divided 0.5÷2.675
    6·2 answers
  • Solve the equation a/a^2-16+2/a-4=2/a+4
    7·1 answer
  • Find the value of X
    10·1 answer
  • 8 people want to split a bag that holds 17 pounds of rice equally.
    9·1 answer
  • Choose an answer and tell me why you chose that :)
    15·1 answer
  • Evaluate lim x approaches to 2 : (sqrt(6-x)-2)/(sqrt(3-x)-1)
    8·1 answer
  • Why is (-3,6] a better answer than (-3,6)
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!