Answer:
340
Step-by-step explanation:
The first step is finding the percentage of those who fail within 19 months.
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

The proportion is the pvalue of Z when X = 19. So



has a pvalue of 0.6808.
Jolt is expected to replace 0.6808 of the connectors sold. Out of 500, that is, on average, 0.6808*500 = 340.
Jolt expects to replace, on average, 340 of the connectors sold.
The answer is 3x2+8x+9 I had the question before
5.60 divided by 4 is 1.40$
The unit is 1.60
Answer:
ight so PSAT means pre-SAT. it doesn't affect your grade. an it don't affect yo chances of getting into college. they wanna see where errybody at, you still wanna do yo best. its preparing you for the SAT i took the psat when i was in 8th grade an they want you to take that shi seriously. buh dont stress about it. they give you plenty of time. im in 10th. buh you finna do great you jus gotta trust in yoself
Answer:
Step 1 and step 2
Step-by-step explanation:
she has to subtract 30 not add 30.
2(3x+6)=3(x-10)
6x + 12 = 3x-30
6x +12 - 12 = 3x - 30 - 12
6x = 3x - 42
6x - 3x = 3x - 42 - 3x
3x = -42
3x/3 = -42/3
x = -14