v₀ = initial velocity of the freight train while it approach a road crossing = 16 km/h = 16 (5/18) m/s = 4.44 m/s
v = final velocity of the freight train after it crosses a road crossing = 65 km/h = 65 x 5/18 m/s = 18.06 m/s
t = time to do so = 10 min = 10 x 60 sec = 600 sec
acceleration is given as
a = (v - v₀ )/t
a = (18.06 - 4.44)/(600)
a = 0.023 m/s²
a = 294
Answer:
See explanation
Step-by-step explanation:
Assuming the given polynomial is

We then rewrite in decreasing powers of u, to get:

The leading term is

The leading coefficient is the coefficient of the leading term.
The leading coefficient is -7.
Answer:
300 percent change
Step-by-step explanation:
300 is 400 percent of 75.(75x4 is 300.) Therefore, the percent change is
400 - 100 = 300.
Answer:
W=4 l=16
Step-by-step explanation:
Let w = width
Let l = length
Since the length is 4 times the width, l=4w
Perimeter of rectangle = 2l + 2w
= 2(4w)+2w
=10w
The perimeter of the rectangle =40, so
40=10w and w=4
Plug w into the length equation : l=4w=4(4)=16
Answer: Your choice is the first one above.
In our inequality, x is our unknown, so that is "a number" in the wording above. 1/2x means half the number. So we have half a number plus 3/4. Of course "plus" means sum, so we have "the sum of half a number and 3/4" so far. The inequality sign is greater than or equal to. That means that the left side CAN equal the right side and it can also be greater than the right side, but it's not ok to be less than the right side.