Answer:
4x^2+19x-5=(x+5)(4x -1)
Step-by-step explanation:
The given expression is 4x^2 + 19x - 5
The leading coefficient is 4 and last term is -5
Multiply them, we get -20
Now find the factors of -20 such that when you add the factors we have to get 19.
-1*20 = -20
20+ (-1) = 19
The right factors are -5 and 9.
4x^2 + 19x - 5 =4x^2 + 20x -1x - 5
= 4x(x + 5) -1(x + 5)
= (x + 5)(4x -1)
The missing factor is (4x -1)
Thank you.
Answer:
Step-by-step explanation:
-1/2 + (3/4 x 4/9)
-1/2 + (3/9)
= - 1/2 + (1/3)
= - 1/6
Answer:
a) 131/450
b) 1233/1276
Step-by-step explanation:
P(bad) = P(1st batch)*P(bad 1st batch ) + P(2nd batch )*P(bad 2nd batch) + P(3rd batch )*P(bad 3rd batch)
p(bad) =(60/360)*(1/3) + (120/360)*(1/4 ) + (180/360)*(1/5)
= 43/180
And that of P(good )
= 1 - 43/180
= 137/180
a)
P(defective) = P(bad)*P(defective /bad) + P(good)*P(defective /good)
= (43/180)*(9/10) + (137/180)*(1/10)
= 131/450
b)
P(Bc I Dc ) = P(good)*P(not defective |good) / P(not defective)
= (137/180)*(1 - 1/10) / (1 - 131/450)
= 1233/1276
Answer:
Company B
Step-by-step explanation:
We would use z score formula
z = (x - μ) / σ
x = raw score
μ = mean
σ = Standard deviation
let x = 260 with the mean μ1 = 276 and standard deviation σ = 5.8
let x = 260 with the mean μ2 = 252 and standard deviation σ = 3.4
z1 = (x- μ1) / σ = (260- 276) / 5.8 = -2.7586206897 = -2.76
z2 = (x2 - μ) / σ = (260 -252) / 3.4= 2.3529411765 = 2.35
Comparing the two z scores, we can see that company B has the probability of producing 260 nails because it has a z score of 2.35 compared to company A with a z score of -2.76.