1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
matrenka [14]
2 years ago
9

Of the marbles in a bag 5 are red 4 are yellow and 4 are blue Sandra will randomly choose one marble from the bag fill in the bl

anks and parts A and B
A: the probability that Sandra will choose a Blue marble from the bag is ___ out of ____ or blank / blank

B: it is _____ that Sandra will choose a Blue marble from the bag.
***for part B: answer unlikely, impossible, certain,likely​
Mathematics
1 answer:
timurjin [86]2 years ago
4 0

Answer:

A. 4/13

B. Likely.

You might be interested in
Mimi needs eleven 18-inch pieces of rhinestone ribbonShe purchased 5 yards of the ribbon shown at the rightWhat is the total amo
GalinKa [24]

Answer:

5.5 yards.

Step-by-step explanation:

We have been given that Mimi needs eleven 18-inch pieces of rhinestone ribbon. She purchased 5 yards of the ribbon. We are asked to find the total amount of ribbon that Mimi needs.

First of all, we will multiply 11 by 18 to find amount of ribbon needed in inches as:

\text{Amount of total ribbon in inches}=11\times 18\text{ inches}

\text{Amount of total ribbon in inches}=198\text{ inches}

We know that 1 yard equal to 36 inches. To convert 198 inches into yards, we will divide 198 by 36 as:

\text{Amount of total ribbon in yards}=198\text{ inches}\times \frac{1\text{ Yard}}{\text{36 inches}}

\text{Amount of total ribbon in yards}=\frac{1\text{19 Yard}}{36}

\text{Amount of total ribbon in yards}=5.5\text{ Yards}

Therefore, the total amount of ribbon that Mimi needs is 5.5 yards.

7 0
3 years ago
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is disc
IgorLugansk [536]

Answer:

True

Step-by-step explanation:

Assemble line is a production process in which parts are joined to the products produced as a partially finished product.

Here the process flow is discreet that is assembled one at a time.

Continous process flow is a type of manufacturing products without disruption of the flow process.

As the name implies,it is continous.

6 0
3 years ago
Can someone please answer. There is a picture. There is only one problem. Thank you so much!!!
Ira Lisetskai [31]
Second answer is correct
7 0
3 years ago
A hose is used to fill an empty wading pool. The graph shows volume (in gallons) in the pool as a function of time (in minutes).
Black_prince [1.1K]
You have to provide the options
5 0
3 years ago
What is 7+8(3to the second power -2
stepladder [879]
7+8*<span>3 to the second power </span>-2
7+72-2
79-2
77
7 0
3 years ago
Read 2 more answers
Other questions:
  • Jason alleges that if the means and mean absolute deviation of two different lists of numbers are the same, then all of the numb
    14·1 answer
  • Identify the slope of the line for the equation y = 10x + 3.
    10·1 answer
  • CAN SOMEONE PLEASE HELP(IM BAD AT MATH)
    15·1 answer
  • Look at photo for the question and answer choices... NO LINKS OR BLANK ANSWERS
    13·1 answer
  • Please help me its about solving system by substitution
    9·1 answer
  • How does the graph of f(x)=x² compare with the graph of f(x)=|x²|
    5·1 answer
  • Solve the following proportion for
    6·1 answer
  • There are 13 boxes of apples there are 10 apples in each box how many apples are there in all
    11·2 answers
  • PLS HELP ME I NEED IT
    12·1 answer
  • Mary spent a total of $354.71 for a party. She spent $200.76 on food, plus an additional $30.79 for each hour of the party. How
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!