Answer:
Thats going to be 12x
Step-by-step explanation:
One JOB = 1 and 2 hours = 120 min
Tyler Rate per minute: 1/120 (in 1 minute he performes 1/120 of the job)
Dakota<span> Rate per minute: 1/90 (in 1 minute he performes 1/90 of the job)
Tyler's + Dakota's rate per 1 minute = 1/120 + 1/90 = 7/360 (Job/minutes)
7/360 of the job was performed in 1 minute
</span>a complete JOB =1 to be performed in x minutes (Rule of three)
x = 1x1/(7/360) that equals to 360/7 and x (time of both) = 51 min 42
Answer:
linear pair
Step-by-step explanation:
the sum of linear pair angles is 180 degree.
so if we apply 16 in place of x in both equations and add them we get 180
Answer:
slope is -3
Step-by-step explanation:
m is the slope, this may have been a trick question.
by the points given the slope is 1