Answer:
18 Minutes
Step-by-step explanation:
Simon and sophie each do a fraction of the job per minute like this:
-Simon does per minute (if we multiply this by 30 we have the completed job)
-Sophie does of the job per minute (again if we multiply this by 45 we have the completed job)
We will add this two to know how much of the job they do together in a minute:
They will do of the job per minute.
So the total time will be when they do , we can put this in one equation like this:
where x is the total times we need to do of the job to complete it. We solve for x:
The answers to the question are are the equations
y = 0.08x²-1.6x+13
y = 0.08(x-10)²+5
<h3>How to solve for the system of equations</h3>
David starts at (20, 13) and skates along a path that can be modeled by a quadratic function with a vertex at (10, 5).
Vertex form of quadratic function is
y =
13 = a(x-10)²+5
let x = 20
a(20-10)²+5
13 = 100a + 5
take like terms
13 - 5 = 100a
8 = 100a
divide through by 100
a = 0.08
hence the equation would be
y = 0.08(x-10)²+5
Read more on equations here:
brainly.com/question/9621134
#SPJ1
Answer:
10
Step-by-step explanation:
since it is a - 10. you would add that to the other side. making it -50. then you divide it by -5. -50 ÷ -5 is 10. as 2 negatives make a positive
8,16,24,32,40,48,56,64,72