Answer:
b. False
Explanation:
It is the opposite, when several systems operate in parallel, total system capacity is the lowest value of the individual system capacities.
For e.g., sectors A, B and C operate in parallel. Sector A can handle 100 units per hour, sector B can handle 150 units per hour and sector C can handle 75 units per hour. The system's capacity is 75 units per hour. If you want to operate at 100 units per hour, a queue will in sector C.
Answer:
Would not exercise its currency option
Explanation:
Currency options are one of the most common ways for corporations , individuals or financial institutions to hedge against adverse movements in exchange rates.
A currency option is a contract that gives the buyer the right , but not the obligation, to buy or sell a certain currency at a specified exchange rate on or before a specified date.
Answer:
True
Explanation:
Firm A is operating at full capacity, if its sales keep increasing, then t will need to invest to expand its production capacity. Since firm B is operating below full capacity level, if its sales keep increasing it will have some spare production capacity it can use before operating at full capacity.
Therefore firm A will need to invest in an expansion of its production capacity while firm B can keep operating without new investments.
Answer:
The product cost for 24,500 units is $497,350.
Explanation:
The reason is that the the product cost always includes all the variable production cost and specific fixed production cost. In this scenario, direct material cost, direct labor cost, variable manufacturing overhead cost are variable production cost whereas the fixed manufacturing cost is specific fixed production cost which will form part of product cost. The remainder of the cost left is period cost.
Direct materials (24,500 * $7.7 per unit) $188,650
Direct labor (24,500 * $4.7 per unit) $115,150
Variable manufacturing overhead (24,500 * $2.2 per unit) $53,900
Fixed manufacturing overhead (24,500 * $5.7 per unit) <u>$139,650 </u>
Total product costs $497,350
Answer:
$88,920
Explanation:
capitalized interest = weighted average accumulated expenditure for the year x interest rate of the loan = $889,200 x 10% = $88,920
Capitalized interest can be added to the basis of the new building that is being constructed. This way, the building's depreciable value will increase.