Answer:
Check the explanation
Explanation:
CPI means Clock cycle per Instruction
given Clock rate 600 MHz then clock time is Cー 1.67nSec clockrate 600M
Execution time is given by following Formula.
Execution Time(CPU time) = CPI*Instruction Count * clock time = 
a)
for system A CPU time is 1.3 * 100, 000 600 106
= 216.67 micro sec.
b)
for system B CPU time is 
= 333.33 micro sec
c) Since the system B is slower than system A, So the system A executes the given program in less time
Hence take CPU execution time of system B as CPU time of System A.
therefore
216.67 micro = =
Instructions = 216.67*750/2.5
= 65001
hence 65001 instruction are needed for executing program By system B. to complete the program as fast as system A
An instance in my life where I rendered services was when I worked in a grocery store.
The roles of entrepreneur include:
- Allocating employees duties.
- Improving standard of living.
- Taking risks.
The three challenges that a young entrepreneur faces today include:
- Financial instability.
- Conflicts with education.
- Lack of business skills.
The top three characteristics of an entrepreneur include:
- Innovation.
- Confidence
- Risk taking
<h3>Who's an entrepreneur?</h3>
It should be noted that a entrepreneur is an individual who owns business and take risks.
The roles of entrepreneur include allocating employees duties, improving standard of living, and taking risks
Learn more about entrepreneur on:
brainly.com/question/353543
#SPJ1
I think it is the model ET-2. Not quite sure.
The answer you're looking for might be "backwards-compatible".
Answer: A flowchart is a type of diagram that represents an algorithm, workflow or process. The flowchart shows the steps as boxes of various kinds, and their order by connecting the boxes with arrows. ... Flowcharts are used in analyzing, designing, documenting or managing a process or program in various fields.
Explanation: brainliest plz!