You need to turn 1/2 to .5 and 3/4 to .75 then you use this equation.
75% * 950,000 (profit)
+ 25% * -285,000 (loss)
<span>= then you subtract the numbers from the separate </span>
<span>= answer --> expected profit from the second mall</span>
Answer: Y=-3x+5
Explanation:
Answer: the rate of speed for train A is 66 miles per hour.
Step-by-step explanation:
Let x represent the speed of train B.
2 trains leave the station at the same time. Train A is traveling 16 miles per hour slower than train B. This means that the speed of train A would be x - 16 miles per hour.
The two trains are 720 miles apart after 4 hours. It means that both trains traveled a total distance of 720 miles in 4 hours.
Distance = speed × time
Distance travelled by train A after 4 hours is
4(x - 16) = 4x - 64
Distance travelled by train B after 4 hours is
4 × x = 4x
Since the total distance travelled by both trains is 720 miles, then
4x - 64 + 4x = 720
8x = 720 - 64 = 656
x = 656/8 = 82 miles per hour
The speed of train A would be
82 - 16 = 66 miles per hour.
We can calculate for the slope of the line using the
formula:
m = (y2 – y1) / (x2 – x1)
From the given values:
m = (4,000 – 10,000) ft / (15 – 0) min
m = -400 ft/min
This means that the altitude is decreasing by 400 ft per
minute.
> The slope is –400 . This means that the helicopter
descends 400 ft each minute.