Answer:
the amount of C required is 190 units of C
Explanation:
the amount of C to cover the necessity of product A is
Ca = A units required * number of C units to manufacture a unit of A
Ca = 30 unit of A * 3 units of C/ unit of A =90 units of C
to produce B the same applies
Cb = B units required * number of C units to manufacture a unit of B
Cb = 25 unit of B * 4 units of C/ unit of B =100 units of C
therefore to cover the necessities of A and also B we will need:
total units of C required = units of C to produce A + units of C to produce B
C = Ca + Cb = 90 units of C + 100 units of C = 190 units of C
C= 190 units of C
Answer:
Explanation:
Java is a class-based, object-oriented programming language that is designed to have as few implementation dependencies as possible. ... Java applications are typically compiled to bytecode that can run on any Java virtual machine (JVM) regardless of the underlying computer architecture
Answer: Online analytical processing
Explanation:
Online analytical processing(OLAP) is the method through which multi-dimension analytical queries can be resolved.User can attain selected query data as per their selection and then assess and analyze them from different view point.
- It helps in viewing and reporting , planning ,performing analytical calculation, collecting data in data cubes etc.
- Other options are incorrect because data adjacency, Ad hoc reporting ,data segregation and E-discovery are not the mechanism through which query and storage of data in data cubes take place.
- Thus, the correct option is online analytical processing