Use the data in the table below to create a scatter plot. Based on your scatter plot, does the data
1 answer:
Answer:
C
Step-by-step explanation:
There is a positive correlation, as hours spent gets bigger the test score gets bigger with some outliers
You might be interested in
z and 100 are on the same line so the total is 180
180-100=z
80=z
Please give Brianest
I think its the second one. So B. because its up 3 on the X-Axis and then the rest are wrong
Answer:
76,105
Step-by-step explanation:
Replace x in the equation with 3.5 and do the arithmetic.
y = 1.3*3.5 -0.52
y = 4.55 -0.52
y = 4.03
The predicted approximate value of y is 4.03.
Answer:
2
Step-by-step explanation: