8.5 • 5 = 42.5
2.5 • 5 = 12.5
42.5 - 12.5 = 30
The first electrician worked 30 hours longer than the second electrician.
Answer:
three sides measuring 4 ft, 8 ft, and 10 ft
Step-by-step explanation:
To choose which dimensions that can create more than one triangle, we consider the given values carefully and how possible it will be to construct.
The only dimensions given in the option that will be possible to create more than one triangle from it, is three sides measuring 4 ft, 8 ft, and 10 ft.
4 ft, 8 ft, and 10 ft are in simple multiple of 2
4 ft, 8 ft, and 10 ft = 2 (2 ft, 4 ft, and 5 ft ), with this we can construct two triangles with three sides measuring 2 ft, 4 ft, and 5 ft.
Answer:
The minimum sample size needed is 125.
Step-by-step explanation:
In a sample with a number n of people surveyed with a probability of a success of
, and a confidence level of
, we have the following confidence interval of proportions.

In which
z is the zscore that has a pvalue of
.
The margin of error is:

For this problem, we have that:

99% confidence level
So
, z is the value of Z that has a pvalue of
, so
.
What minimum sample size would be necessary in order ensure a margin of error of 10 percentage points (or less) if they use the prior estimate that 25 percent of the pick-axes are in need of repair?
This minimum sample size is n.
n is found when 
So






Rounding up
The minimum sample size needed is 125.
Answer:
23.28 inches (im not sure if this is correct because you need length, height, and width.)
Step-by-step explanation:
<u>lwh</u>
3
<u>Answer:</u>
The Ranking Percentile is (B) 97.5%
<u>Explanation
:</u>
To find the percentile rank we need to find the z- score. After finding the z-score match this value with the corresponding value in z-score table.
Formula to find the z-score
Z-score=
Substituting the values in the above equation, we find
Z-score=
=2
So, the Z-score is +2
Now, the corresponding value of Z-score 2 in the table is 0.9772
or the percentile score is 97.72 ~ 97.5
.