we have

using a graph tool
see the attached figure
So
1) the domain of the function is all real numbers-----> interval (-∞,∞)
2) the range of the function is the interval [-1, ∞)
3) the function decrease on the interval (-∞,2)
4) the function increase on the interval (2,∞)
5) the function has two x-intercepts-----> (1,0) and (3,0)
6) the function has one y-intercept-----> (0,1)
therefore
the graph in the attached figure
X would equal 5 because if you do x over 40 equals 7 over 56, then you could cross multiply and get 56x=280 (7 x 40). Then you do 280 divided by 56 and x would equal 5
Answer:
39
Step-by-step explanation:
32000 containers × (8 min)/(16 containers) × (1 h)/(60 min) × (1 workday)/(7 h)
= (32000×8)/(16×60×7) workdays
≈ 38.095 workdays
It will take 39 work days to produce 32,000 containers.
True is the answer in this question. It is true that the data type decimal (5,2) represents a number with three places to the left and two places to the right of the decimal places. So the answer in this question is basically true. 5 and 2 has 3 numbers in between so it is true that that number is three places to the left and two places to the right of the decimal.
39mm=6m
52/39= 1 1/3
1 1/3 times 6 meters
4/3 times 6/1 = 24/3
24/3=8
The actual length of the living room is 8 meters