- The kind of curve obtained is linear.
- The relationship between the variables is direct variation.
- After 4.5 seconds, I expect the velocity to be equal to 140 ft/s.
- The amount of time required for the object to attain a speed of 100 ft/s is 3.2 seconds.
<h3>What is a graph?</h3>
A graph can be defined as a type of chart that's commonly used to graphically represent data on both the horizontal and vertical lines of a Cartesian coordinate, which are the x-axis and y-axis.
In this exercise, you're required to plot a graph for the data (velocity and time) recorded for an object that is falling from rest.
Based on the graph for the data (see attachment), we can logically deduce the following points:
- The kind of curve obtained is linear.
- The relationship between the variables is direct variation.
- After 4.5 seconds, I expect the velocity to be equal to 140 ft/s.
- The amount of time required for the object to attain a speed of 100 ft/s is 3.2 seconds.
Read more on graphs here: brainly.com/question/25875680
#SPJ1
Complete Question:
Plot a graph for the following data recorded for an object falling from rest
a. What kind of a curve did you obtain?
b. What is the relationship between the variables?
c. What do you expect the velocity to be after 4.5 s?
d. How much time is required for the object to attain a speed of 100 ft/s?
Answer:
The unit rate = 7/10 cranes per minute
Step-by-step explanation:
So, the number of minutes would it would take Kenny to fold 1505 cranes is
10/7 x 1505 = 2150 minutes
2150/60 = 35 5/6 hours
Cylinder formula is 2pi(r)^2 + 2pi(r)h
2pi(0.25)^2 + 2pi(0.25)(1)
Chuck that in calculator and evaluate
Answer:tan c
Step-by-step explanation:
Answer:
121,6
Step-by-step explanation:
Since the only difference between the triangles are the letters and a few missing numbers, just replace the letters to get your answer. A and D are the same B and E are the same and C and F are the same. So the measurement of angle A is 121 degrees and the length of AB is 6