Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.
Answer:
Step-by-step explanation:
m=(y2-y1)/(x2-x1)
Answer:
X= -3/2
Step-by-step explanation:
6x/6=-9/6
The figure on the left side shows the water level is at the 0.5 liter mark, ie half a liter.
1 liter = 1000 mL
0.5*1 liter = 0.5*1000 mL
0.5 liter = 500 mL
If you poured all the water into the jug on the right (without spilling), then the water level should reach the 500 mL mark. This is the small tickmark exactly halfway between the 400 and 600.
Answer:
C. (X+2)(x-6)
Step-by-step explanation:
- x^2-4x-12
- x^2-6x+2x-12
- x(x-6)+2(x-6)
- (x+2)(x-6)