From the information given;
1 bag of concrete = 1000 in^3
2 bags at home = 1000*2 = 2000 in^3
The available space has a volume of;
Volume = (5*12)*10*10 (Note: 1 ft = 12 inches)
Volume = 60*10*10 = 6000 in^3
The remaining volume = Available space - occupied space = 6000 - 2000 = 4000 in^2
1 bag = 1000 in^3
x bags = 4000 in^2
Then,
x = 1*4000/1000 = 4 bags.
This means 4 more bags of concrete will be required to fully fill the space.
Answer:
$1382
3455 is 5/7 of salary so divide 3455/5 = 691
then multiply 691x2 because rent is 2/7 of salary
691x2 = 1382
Answer:
16
Step-by-step explanation:
4(x - 1)2 + 3y
12-4+2+6
8+2+6
10+6
16 i think