Answer:
Weight of copper: 62,000 lbs. (31 tons). Weight of framework: 250,000 lbs. (125 tons). Weight of concrete foundation: 54,000,000 lbs. Thickness of copper sheeting: 3/32 of an inch, the thickness of two pennies placed together. the answer in 125
Step-by-step explanation:
Answer:
Step-by-step explanation:
1. There is a total of 16 outcomes
2. To get outcomes with a sum GREATER than 5, we have
2+4, 3+3, 3+4, 4+2, 4+3, 4+4 for a total of 6 outcomes.
3. To spin the same number twice, the possible outcomes are
1-1, 2-2, 3-3, 4-4 for a total of 4 outcomes.
The number of small tiles are needed is 300 tiles.
<h3>Number of tiles needed</h3>
Using area of rectangular formula
Area of the room = length(l) × breadth (b)
Area of the room=300 cm×180 cm
Area of the room=54,000 cm²
Number of tiles needed = Area of rectangular region / Area of one tile
Number of tiles needed=54,000/180
Number of tiles needed=300 tiles
Therefore the number of small tiles are needed is 300 tiles.
Learn more about number of tiles needed here:brainly.com/question/2136390
#SPJ1
Byron would have to work 13 hours to earn $143.00