1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vlad [161]
3 years ago
6

3.0188 rounded to the nearest thousandths

Mathematics
1 answer:
Ne4ueva [31]3 years ago
4 0
3.0200 is 3.0188 rounded to the nearest thousandth.
You might be interested in
Each music class sings 8 songs a week. How. Many songs does each class sing in 5 weeks 6 weeks 7 weeks
crimeas [40]

Answer:

40, 48, 56

Step-by-step explanation:

8x5 is 40

8x6 is 48

8x7 is 56

I hope this helps have a good day

7 0
3 years ago
A graph is shown below:
bogdanovich [222]
The answer would be C because b=+16 which means that it intercepts line y at 16, which is shown in the graph.
5 0
2 years ago
Read 2 more answers
he books in a private library are classified as fiction and nonfiction. There are 400 books in the library. There are 40 more fi
vfiekz [6]
First, you have to set a system of equations to determine the number of fiction and of nonfiction books.Call f the number of fiction books and n the number of nonfiction books. Then 400 = f + n. And f = n + 40 => n = f - 40 => 400 = f + f - 40 => 400 - 40 = 2f => f = 360 / 2 = 180. Now to find the probability of picking two fiction books, take into account the the Audrey will pick from 180 fiction books out of 400, and Ryan will pick from 179 fiction books out of 399, so the probability will be<span> (180/ 400) * (179/399) = 0.20 (rounded to two decimals). Answer: 0.20</span>
3 0
3 years ago
PLEASE HELP WILL MARK BRAINLIEST AND GIVE 5.0 STAR RATING
stiv31 [10]

Answer:

I believe the answer should be 4.1 units.

4 0
2 years ago
Read 2 more answers
Labor rate = $7.50 per hour Labor time = 6.5 hours Retail price of parts = $0 Total job cost = $82.00 Overhead rate?
Ulleksa [173]
Total cost job=
Retail price of parts+labor cost+manufacturing overhead

Total cost job 82

Retail price of parts 0

Labor cost=7.5×6.5=48.75

Manufacturing overhead ?

82=0+48.75+?

?=82−48.75

?=33.25

Manufacturing overhead is 33.25

Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%

The answer 68.2%




4 0
2 years ago
Other questions:
  • Divide use either way to record partial quotient 198÷9
    6·1 answer
  • Factor x^2a^2 + 3xa^2 + 2a^2. Show your work.
    13·1 answer
  • How does the mean of the data set below change if each value is increased by 8?
    14·1 answer
  • The image of (-2, 7) reflected across the x-axis is
    15·2 answers
  • Carina buys a set of business checks from her bank. The checks cost her $26.73. She gives the teller $30.23. How much change sho
    7·1 answer
  • Plz help<br><br> x-2 1/4=1/18
    9·2 answers
  • Area of polygon A=l*w (7x-9)(3x)
    8·1 answer
  • Complete an amortization schedule for a $27,000 loan to be repaid in equal installments at the end of each of the next three yea
    11·1 answer
  • What is the sum of -1/2 and 8/6 <br> a) -5/6<br><br> B) -11/6<br><br> C) 5/6<br><br> D) 11/6
    8·1 answer
  • 8 classmates share 4 pizzas equally
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!