81ft(yd/3ft)*111ft(yd/3ft)*2in(yd/36in)=55.5 yd^3
So 55 1/2 cubic yards of topsoil are needed.
Answer:
minimum value is: the left whisker
Step-by-step explanation:
box an whisker plot: left line is the minimum, first part of the box is Q1, where the box has a middle line it is called Median, the other end of the box is Q3, the right line is called the maximum whisker.
Hope this helps
Answer:
See below
Step-by-step explanation:
