9.5 AU is the correct answer to that question hope this helps you out
Answer:
Answer to question a = 95.4
Answer to question b = UCL = 96.07
LCL = 94.73
Answer to question c = Process is still in control
Step-by-step explanation:
a. The computation of estimate mean is as shown below:-
= 95.4
b. The computation of Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process is shown below:-
= 95.4 + 0.67082
= 96.07
= 95.4 - 0.67082
= 94.73
c. The explanation is shown below:-
From the above calculation we can see that the sample lies between LCL AND UCL that is (94.73 ,96.07) ,
The Process is still in control
Answer:
The rate of change is -2
Step-by-step explanation:
f(b)-f(a) 12-2 10
---------- = ------------ = -------- = -2
b-a 1-6 -5
Answer:
More sod is needed
Step-by-step explanation:
Well we know that 3/4 of a bag of sod covers 55 ft^2 then if we divide 55 by 3 we get 18.3333 we take that and multiply by 4 to get 73.333 or the amount one bag of sod can cover
73.333*3 cuz 3 bags of sod is 220 ft^2
She needs more sod
Answer:
138, 460 m²
Step-by-step explanation:
How To Find Volume of Pyramid With Slant Height? If 'x' is the base length, 's' is the slant height, and 'h' is the height of a regular pyramid, then they satisfy the equation (the Pythagoras theorem) (x/2)2 + h2 = s2.