Answer:
p= -3/2 or p= -1 1/2
Step-by-step explanation:
Answer:
The answer is D. Surface Tension. :) I am forsure this is correct but please let me know. If I am correct please rate me 5 and thank me and mark me brainlest :)
Step-by-step explanation:
Answer:
t≅13.33h
Step-by-step explanation:
Adam (A) works at constant rate of 50tiles/h
Briana (B) works at constant rate of 55tiles/h, this means that A=50 tiles per hour and B=55 tiles per hour, then A+B = 105tiles/h together, but the floor consists of 1400tiles, so if 105 tiles are installed in one hour, then 1400 tiles in how long they will be installed?
t = 1400tiles*h/105tiles≅ 13.33 h
See tha attached pdf file and let me know how useful this answer is.
Answer: 56
Step-by-step explanation: Divide 42 by 3 and then multiply by 4