1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Kay [80]
3 years ago
6

1)Find the cost of fencing a rectangular park of length 175m and breadth 125m at the rate of 12/Rs per metre.

Mathematics
1 answer:
CaHeK987 [17]3 years ago
5 0

Step-by-step explanation:

Length of rectangular park = 175 m

Breadth of rectangular park = 150 m

Perimeter of park = 2 x (length + breadth)

= 2 x (175 + 150)

= 2 x 325 = 650 m

Since, cost of fencing park per meter = = Rs. 12

Therefore, cost of fencing park of 600 m = 12 x 650 = Rs. 7,800

Square park=250m

Perimeter of the square park x 4

=250x4

=1000m

So, the cost of the fencing at the park would have a rate of 20 per m = 1000x20

=20000

You might be interested in
Simplify the fraction below.<br><br> 35/4
omeli [17]

Answer:

8 3/4

Step-by-step explanation:

find the greatest common factor of 35 and 4, which is 1.  Then divide both 35 and 4 by the greatest common factor to get the following simplified fraction: 35/4

If the numerator is greater than or equal to the denominator of a fraction, then it is called an improper fraction. You could convert it into a whole number or mixed number fraction. Which would now be 8 3/4

(If its not right let me know so I can rethink my answer)

4 0
3 years ago
Read 2 more answers
What is the actual distance
lidiya [134]
the answer would be 119.3 miles
7 0
4 years ago
sound travels 1129 feet per second air. how far can sound travel in 2 seconds when traveling through hair
Temka [501]

Answer:

Sound travels 2258 feet in 2 seconds while travelling through air.

Step-by-step explanation:

4 0
3 years ago
Read 2 more answers
A boating company charges $10 equipment fee and $5.50 per hour to rent a canoe. Which is the correct linear equation for this si
Solnce55 [7]

Answer:

y =mx +b

Where m is the slope and b the intercept.

Using the information given the variable cost 5.5 per hour represent the slope and the fixed cost 10 represent the value of b and then our model would be given by:

y =5.5 x+ 10

Wher y is the total cost and x the hours rented

Step-by-step explanation:

For this case we want to model the situation with a general equation given by:

y =mx +b

Where m is the slope and b the intercept.

Using the information given the variable cost 5.5 per hour represent the slope and the fixed cost 10 represent the value of b and then our model would be given by:

y =5.5 x+ 10

Wher y is the total cost and x the hours rented

3 0
3 years ago
Anyone can help with this answer please
Mademuasel [1]
The volume of figure B is 15
8 0
3 years ago
Other questions:
  • Help Please!! &lt;3
    13·1 answer
  • It says 7/6x= 140 I am lost can somebody please help me
    11·1 answer
  • Help me please i would really appreciate it!
    15·1 answer
  • John can eat 10 hot dogs in 4 mins. At this rate, how many hot dogs can he eat in 18 mins?
    13·2 answers
  • Out of 3
    11·1 answer
  • Plllllllease helpppppp
    12·1 answer
  • "Two-thirds of a number increased by seven."
    15·1 answer
  • What is KN + IK?<br> !it’s not 1!
    9·1 answer
  • Evaluate 3^−1⋅(4⋅6)⋅2^−3
    7·1 answer
  • Which of the following angles is corresponding with 25?<br> 02<br> 07<br> 08<br> 04
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!