Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Answer:
10
Step-by-step explanation:
10x0 is 0
10x1 is 10
Answer: So, the length (L) = 7 3/4 ft = 31/4 (as an improper fraction)
the width (W) = (1/3)xL
So the width = 1/3 x (31/4) =
31/12 = 2 7/12 feet
Step-by-step explanation:
Answer:
D. y = -5/7x + 5
Step-by-step explanation:
5x + 7y = 35
-5x -5x
7y = 35 - 5x
/7 /7 /7
y = 35/7 - 5/7 x
y = 5 - 5/7x
Answer is 20 by plugging the 4 in the equation it equals 20