Answer: $2112.40
Step-by-step explanation:
r = 0.02 (2%)
n = 365 (daily for a year)
p = 1950
You wrote the formula wrong too:
B = P x (1+r/n)^nt
t = 4
B = 1950 x 1.08...
B = $2112.40
Step-by-step explanation:
The T-shirt is launched with an initial upward velocity of 60 ft/s from a height of 5 feet. Its equation of motion is given by :
....(1)
(a) For maximum height, put 
So,

Now put,

So, the time taken for the T-shirt to reach maximum height is 2.5 seconds.
(b) Put x = 2.5 s in equation (1)
The y-intercept is changed from 2 to -4.
That means that the point that the graph crosses the y axis has been moved down by 6.
Since the slope of the line has not changed, this just means the graph of the line will be moved down by 6.
Hope this helps!
Your fortune is "When given a difficult choice, trust your gut. If you don't have one, then close your eyes and hope for the best."
<h3>
Answer: 83.85%</h3>
This value is approximate.
==========================================================
Explanation:
Let's compute the z score for x = 40
z = (x-mu)/sigma
z = (40-47)/7
z = -1
We're exactly one standard deviation below the mean.
Repeat these steps for x = 68
z = (x-mu)/sigma
z = (68-47)/7
z = 3
This score is exactly three standard deviations above the mean.
Now refer to the Empirical Rule chart below. We'll add up the percentages that are between z = -1 and z = 3. This consists of the two pink regions (each 34%), the right blue region (13.5%) and the right green region (2.35%). These percentages are approximate.
34+34+13.5+2.35 = 83.85
<u>Roughly 83.85%</u> of the one-mile roadways have between 40 and 68 potholes.