A. 4.25 hrs.....4 25/100 reduces to 4 1/4.......1/4(60) = 60/4 = 15 minutes
so 4.25 hrs = 4 hrs and 15 minutes
b. 8.5 hrs.....8 5/10 reduces to 8 1/2.....1/2(60) = 60/2 = 30 minutes
so 8.5 hrs = 8 hrs and 30 minutes
c. 6.2 hrs.....6 2/10 reduces to 6 1/5.....1/5(60) = 60/5 = 12 minutes
so 6.2 hrs = 6 hrs and 12 minutes
d. 10.8 hrs.....10 8/10 reduces to 10 4/5.....4/5(60) = 240/5 = 48 minutes
so 10.8 hrs = 10 hrs and 48 minutes
Given:
loan amount = 300
finance charge = 20
term = 14 days.
To solve for APR.
<span>1. Divide the finance charge by the loan amount.
20/300 = 0.0667
2. Multiply the result by 365.
0.0667 x 365 = 24.35
3. Divide the result by the term of the loan.
24.35/14 = 1.74 (APR in decimal format)
<span>
4. Multiply the result by 100.
1.74 x 100 = 174% APR</span></span>
Answer:
0.81859
Step-by-step explanation:
We solve using z score method
The formula for calculating a z-score is is z = (x-μ)/σ,
where
x is the raw score
μ is the population mean
σ is the population standard deviation.
Mean 0.8 pound
Standard deviation 0.25 pound
For x = 0.55 pound
z = 0.55 - 0.8/0.25
= -1
Probability -value from Z-Table:
P(x = 0.55) = 0.15866
For x = 1.3 pounds
Z = 1.3 = 0.8/0.25
= 2
Probability value from Z-Table:
P(x = 1.3) = 0.97725
The probability that a randomly selected zucchini will weigh between 0.55 pound and 1.3 pounds is
P(x = 1.3) - P(x = 0.8)
0.97725 - 0.15866
0.81859.
Answer:
C. 1:27
Step-by-step explanation:
a²/b²=1/9 => a=1 and b=3
a³/b³=1³/3³=1/27
C. 1:27