Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
36.3 because the digit in the hundredths place is not 5 or greater
Answer:
y = 4x - 19
Step-by-step explanation:
The line is parallel to the line whose equation is;
y = 4x + 1
Parallel lines have the same slope so the slope of our line is 4.
The line passes through point (5,1)
Slope = change in y ÷ change in x
Taking another point (x,y) on the line,
Slope =
= 4
y - 1 = 4x - 20
y = 4x - 19
Answer:
It would probaly be 10
Step-by-step explanation:
Remember A scaling triangle has different numbers for every side