Answer:
The gradient of the straight line that passes through (2, 6) and (6, 12) is
.
Step-by-step explanation:
Mathematically speaking, lines are represented by following first-order polynomials of the form:
(1)
Where:
- Independent variable.
- Dependent variable.
- Slope.
- Intercept.
The gradient of the function is represented by the first derivative of the function:

Then, we conclude that the gradient of the staight line is the slope. According to Euclidean Geometry, a line can be form after knowing the locations of two distinct points on plane. By definition of secant line, we calculate the slope:
(2)
Where:
,
- Coordinates of point A.
,
- Coordinates of point B.
If we know that
and
, then the gradient of the straight line is:



The gradient of the straight line that passes through (2, 6) and (6, 12) is
.
Answer:
8 Hours Because 6×8=48 Plus The Cost Was 10$ You Would Just Do 48 + 10 = 58
Step-by-step explanation:
6 × 8 =48 + 10 = 58
19.8 rounded to 1 s.f. is
20
Answer: Two triangles have the same side lengths (Ex: both triangles have sides 3, 4, and 5 cm)
Step-by-step explanation:
1) This would guarantee similarity, but not necessarily that they are identical.
2) The angle has to be included between the two sides, which is not specifed.
3) This would work (SSS congruence)
4) It is not specified if the side is opposite the corresponding angles.
Answer:
The bulbs should be replaced each 1060.5 days.
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

How often should the bulbs be replaced so that no more than 1% burn out between replacement periods?
This is the first percentile, that is, the value of X when Z has a pvalue of 0.01. So X when Z = -2.325.




The bulbs should be replaced each 1060.5 days.