Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
Answer:
We can measure 4 gallon by successively.
Step-by-step explanation:
We have been given that you have an 8-gallon jug of water and two empty jugs with capacities of 5 gallons and 3 gallons, respectively. We are asked to prove or disprove that you can measure 4 gallon by successively pouring some of or all of the water in a jug into another jug.
First of all, we will pour 5 gallons of water from 8 gallon jug. Then we will pour 5 gallons of water from 5 gallon jug to 3 gallon jug. That will result in 2 gallons of water in 5 gallon jug.
Now, we will pour 3 gallons of water from 3 gallon jug to 8 gallon jug and pour 2 gallons from 5 gallon jug into 3 gallon jug. That will give us 6 gallons in 8 gallon jug and 2 gallons in 3 gallon jug and empty 5 gallon jug.
In our last step, we will fill 5 gallons jug from 8 gallon jug. After filling 5 gallon jug, we will fill 3 gallons jug from 5 gallon jug. Since 3 gallon jug already contains 2 gallons water, so it can only take one more gallon.
After pouring one gallon from 5 gallon jug, we will get 4 gallons water in 5 gallon jug.
Therefore, we can measure 4 gallon by successively pouring some of the water in a jug into another jug.
Uhhh
Could you finish the question?
Answer:
uh okay I'm just stumbling upon questions like this
Answer: 1. the negative of the conclusion is true